CRITERIA FOR THE ASSIGNMENT OF CONTRACTORS'/CONSULTANTS' MATERIALS ENGINEERS

Accredited materials engineers may be assigned to DPWH projects, subject to the following limits of assignment:

a. Materials Engineer I 
- One (1) project costing not more than P150M,or
- Two (2) projects, with an aggregate cost of not more than P250M, or
- Three (3) projects, with an aggregate cost of not more than P200M.


b. Materials Engineer II 
- One (1) project, no cost limit, or
- Two (2) projects, with an aggregate cost of not more than P300M, or
- Three (3) projects, with an aggregate cost of not more than P250M.


Non-accredited materials engineers may be assigned to three (3) projects, with an aggregate cost of P15.0M or below.